CONSTRUCTION SUMMARY – GROUP 2
Charles Orr |
|
|
Heating Controls |
Replace damper operators and control valves, and install thermostats and controls on unit heaters |
|
Windows |
Replace all wood and metal framed windows |
| Foundation | Repair settlement and cracking as needed, under windows |
|
Walls & Chimneys |
Tuckpoint and replace stone sills where required; replace brick veneer system; repair base of exterior steel columns at the southwest entry |
|
Security Systems |
Replace exterior lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp; install ramp; prepare door frames for future ADA power-assist |
|
Site Conditions |
Replace concrete sidewalks |
|
Exterior Doors |
Replace wood doors, frames and hardware |
|
Cleveland School of the Arts |
|
|
Heating Controls |
Replace pneumatic and thermostats control valves on steam radiators; replace air compressor and air dryer |
|
Security Systems |
Replace exterior lighting |
|
Site Conditions |
Provide asphalt topcoat on parking areas in poor condition |
|
East High |
|
|
Heating Controls |
Rework controls and rebalance outside air for 13 air-handling units; replace parking garage damper, exhaust fan, CO controls, and balance system; rework ductwork in office areas; |
|
Windows |
Replace aluminum windows and plastic glazing |
|
Foundation |
Waterproof underground garage areas leaks; repair spalled concrete and rusted steel bearing plates below NW entry main entry |
|
Walls & Chimneys |
Tuckpoint, caulk, and replace sills as required |
|
Security Systems |
Security Systems Replace exterior lighting |
|
Emergency Lighting |
Emergency Lighting Install LED exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp at NW main entry; prepare door frame for future ADA power-assist |
|
Site Conditions |
Repair concrete sidewalk in the garage and NW main entry |
|
Exterior Doors |
Replace doors, frames and hardware |
|
East Technical High |
|
|
Heating Controls |
Replace 188,244 sf built-up roof; replace cap flashing and coping |
|
Roofing |
Repair 10 unit ventilators; 10 roof mounted exhaust fans; repair gym and auditorium air handling units and rebalance; repair/replace greenhouse ventilation system; provide carbon monoxide detection for underground parking garage |
|
Floors & Roofs |
Repair quarry tile at front elevation |
|
Security Systems |
Replace broken exterior light fixtures, lamps, covers, and guards |
|
Emergency Lighting |
Install LED exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install concrete ramps for at-grade entries, provide curb cut at basement garage and east entry; prepare door frames for future ADA power-assist |
|
Site Conditions |
Repair cracked and settled asphalt paving; provide asphalt topcoat on parking lot |
|
Exterior Doors |
Replace doors, frames and hardware |
Harry E. Davis |
|
|
Heating Controls |
Replace damper operators and control valves, and install thermostats and controls on unit heaters; repair kitchen exhaust fans and replace controls; clean hood exhaust ductwork |
|
Foundation |
Waterproof basement boiler room |
|
Security Systems |
Replace exterior lighting |
| Emergency Lighting | Install LED exit signs with battery back-up wallpacks |
| Handicapped Access |
Install ramp |
| Site Conditions | Provide asphalt topcoat on parking lot |
| Life Safety | Replace missing stair handrails |
|
Martin L. King School |
|
|
Heating Controls |
Replace/repair economizer and outdoor air damper controls on 15 rooftop air conditioning units and rebalance; install carbon monoxide detection system and exhaust fans for parking garage |
| Walls & Chimneys | Tuckpoint and caulk masonry; replace brick veneer system |
| Security Systems | Repair/replace exterior lighting |
| Exterior Doors | Replace doors, frames, and hardware; prepare frames for future ADA power-assist |
| Life Safety | Install 15 fire-rated doors at stairwells that originally had fire-rated doors |
|
Mary B. Martin |
|
|
Heating Controls |
Replace damper operators and control valves; install thermostats; clean make-up air unit and supply air ductwork for art room; replace 2 roof-mounted exhaust fans; clean gym heating and ventilating unit ductwork and rebalance unit; install new exhaust fan to gymnasium |
| Windows | Repair aluminum windows |
| Security Systems | Replace exterior fixtures where required, install new lamps and guards on existing lights |
| Emergency Lighting | Install LED exit signs with battery back-up wallpacks; install combination exit/egress sign in gym |
| Handicapped Access | Install ramps and prepare door frames for future ADA power-assist |
| Exterior Doors | Replace wood doors, frames, and hardware |
Mary M. Bethune |
|
|
Heating Controls |
Replace operators on dampers and control valves at all classroom unit ventilators; provide electric thermostats and controls inside unit ventilators; repair boiler condensate/feedwater pump; provide new belts and pulleys for roof mounted exhaust fans; install exhaust fans and clean and rebalance gym makeup air unit |
|
Windows |
Replace aluminum windows |
|
Security Systems |
Replace existing exterior building-mounted fixtures |
|
Emergency Lighting |
Install LED exit signs with battery back-up wallpacks in critical areas only |
|
Site Conditions |
Patch and apply asphalt topcoat |
|
Exterior Doors |
Replace doors, frames, and hardware |
| Sunbeam | |
| Heating Controls |
Replace controls on 2 heat exchangers; replace condensate return pump and receiver; replace radiator control valves and thermostats; replace control air compressors and main air piping and add air dryer; replace building exhaust fans; rebalance air handling system |
| Roofing | Replace 54,473 sf built-up asphalt roof; repair/replace 3,000 linear feet of cap flashing and coping; replace 8,060 sf sloped roofing and repair cupola |
| Windows | Replace wood windows |
| Walls & Chimneys | Tuckpoint and caulk masonry, replace brick veneer system, lintels and sills repair parapet walls |
| Floors & Roofs | Repair structural slabs; repair spalled areas in 1965 addition; repair boiler room plaster ceiling; repair deterioration in coal room and ash room, repair roof deck |
| Security Systems | Replace site lighting |
| Emergency Lighting | Install LED exit signs with battery back-up wallpacks in critical areas only |
| Handicapped Access | Install ADA power-assist door and frame at main entry |
| Site Conditions | Remove coal bin and replace paving; replace concrete curbs and sidewalks |
| Exterior Doors | Replace doors, frames, and hardware |
| Wade Park | |
| Heating Controls |
Repair economizer controls and damper operators in 7 HVAC rooftop units |
| Windows | Replace cracked or broken skylights |
| Security Systems | Install exterior lighting |
| Emergency Lighting | Install LED exit signs with battery back-up wallpacks in critical areas only |
| Handicapped Access | Provide curb cut to parking lot entry door; install ramp at library; prepare door frames for future ADA power-assist at main entry, parking lot entry and door to the playground |
| Exterior Doors | Replace doors, frames, and hardware |