CONSTRUCTION SUMMARY – GROUP 1
Captain A. Roth |
|
|
Heating Controls |
Repair unit ventilators, temperature control systems and boiler controls as required; replace steam traps |
|
Windows |
Replace all windows |
|
Walls & Chimneys |
Repair or replace corroded lintels and brick required for the window treatment |
|
Security Systems |
Supplement existing security system and provide security lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp; and curb cut |
|
Site Conditions |
Replace or repair concrete sidewalks and curbs and miscellaneous patching of parking lots to provide safe access to the building |
|
Exterior Doors |
Replace doors, frames and hardware |
|
Franklin D Roosevelt |
|
|
Windows |
Replace all windows |
|
Security Systems |
Supplement existing security system and provide security lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp; and curb cut |
|
Site Conditions |
Repair to sidewalks and stairs on gymnasium side; correct drainage and water runoff |
|
Iowa Maple |
|
|
Heating Controls |
Repair unit ventilators, temperature control systems and boiler controls as required; replace steam traps |
|
Roofing |
Replace roof and all related components including flashing, fascias and roof ladders |
|
Windows |
Replace all windows |
|
Walls & Chimneys |
Repair or replace corroded lintels and brick required for the window treatment |
|
Security Systems |
Supplement existing security system and provide security lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Fire Alarm |
Install fire alarm system throughout building |
|
Handicapped Access |
Install ramp at south entrance; and curb cut |
|
Site Conditions |
Partial repair or replacement of sidewalks and curbs and miscellaneous patching of parking lots |
|
John F. Kennedy |
|
|
Heating Controls |
Repair unit ventilators, temperature control systems and boiler controls as required; replace steam traps |
|
Ventilation/AC |
Repair cooling tower |
|
Windows |
Replace all windows throughout the main building |
|
Foundation |
Repair foundation for leak related deficient roof drain |
|
Walls & Chimneys |
Repair or replace corroded lintels and brick required for the window treatment |
|
Security Systems |
Supplement existing security system and provide security lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp at north entrance; and curb cut |
|
Site Conditions |
Partial repair or replacement of sidewalks and curbs and miscellaneous patching of parking lots |
|
Exterior Doors |
Replace doors, frames and hardware |
|
Robert H. Jamison |
|
|
Heating Controls |
Repair unit ventilators, temperature control systems and boiler controls as required; replace steam traps |
|
Ventilation/AC |
Repair cooling tower |
|
Windows |
Replace all windows throughout the main building |
|
Walls & Chimneys |
Repair masonry to include brick replacement, tuckpointing, repair or replacement to steel lintels, and repair to the concrete entrance stairs |
|
Security Systems |
Supplement existing security system and provide security lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp at south entrance; and curb cut |
|
Site Conditions |
Partial repair or replacement of sidewalks and curbs and miscellaneous patching of parking lots |
|
South High |
|
|
Heating Controls |
Repair unit ventilators; temperature control systems and boiler controls as required |
|
Security Systems |
Supplement existing security system and provide security lighting (including Washington Park Annex) |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks (including Washington Park Annex) |
|
Handicapped Access |
Install ramp at entrance; and curb cut |
|
Site Conditions |
Partial repair or replacement of sidewalks and curbs and miscellaneous patching of parking lots; east parking lot to be replaced |
|
Exterior Doors |
Replace doors, frames and hardware |
|
Washington Park Annex |
|
|
Ventilation/AC |
Install exhaust system with CO control system in garage |
|
Whitney Young |
|
|
Heating Controls |
Repair unit ventilators, temperature control systems and boiler controls as required. Repair boilers and replace steam traps |
|
Roofing |
Replace roof and all related components including flashing, fascias and roof ladders (annex building not included) |
|
Windows |
Replace all windows throughout |
|
Walls & Chimneys |
Repair deficient exposed concrete deck at the roof edge and repair or replace corroded lintels and brick required for the window replacement and roof replacement |
|
Security Systems |
Supplement existing security system and provide security lighting |
|
Emergency Lighting |
Install exit signs with battery back-up wallpacks |
|
Handicapped Access |
Install ramp at entrance; and curb cut |
|
Site Conditions |
Patch and apply asphalt topcoat |
|
Exterior Doors |
Replace doors, frames, and hardware |